MO 861 Project

  • Tripod platform with 2 process decks
  • Set in 50' water 20 miles south of Pascagoula, MS.
  • Installed with compression, bulk gas separation and gas dehydration modules.
  • Produced at 10 MMSFD dry gas from shallow reservoir.
  • Flowline 4" from platform to subsea tie-in to 12" main.

OPS Contributions

  • Designed platform structural needs and process requirements of MO 861 and its subsea flowline.
  • Coordinated refurbishment of surplus deck and jacket structure in New Iberia, La.
  • Competitively bid and managed installation & start-up of platform structure, facilities and 4" flowline offshore east Mississippi.
  • Timeline from engineering design to first production = 1 year (hindered by after effects of Katrina and Rita)